Jump to content

Translations:KAVAN Strike DLG 1498mm - Instruction manual/11/de: Difference between revisions

From KAVAN RC Wiki
FuzzyBot (talk | contribs)
Marked translation unit as no longer outdated with no changes
 
(No difference)

Latest revision as of 12:47, 2 June 2026

Message definition (KAVAN Strike DLG 1498mm - Instruction manual)
=== Model assembly ===
==== Tail Surfaces ====
* Trial fit the parts of the horizontal stabiliser, elevator, fin and rudder – no glue yet! Sand as necessary to obtain a perfect fit. ('''Fig. 1''')
* Roughen the surface of the 3×0.5 mm '''R3''' carbon spar using No. 120 sandpaper and glue it with medium CA to the trailing edge of the fin '''R1'''. 
* Glue the '''T3''' Lite Ply reinforcement plate into the horizontal stabilizer '''T1'''. Once the glue has cured sand it flush with the stabiliser.
* Sand the entire surface of the horizontal stabiliser, elevator, fin and rudder with No. 120–150 sandpaper; round the outer edges. Bevel the leading edges of the rudder and elevator, referring to the '''Det. D-D'''.
* Put the tail surfaces aside for now; they will be finished after the tailplane seat is installed on the tail boom.

Bau des modells

Leitwerke

  • Bereiten Sie und richten Sie die Leitwerksteile trocken aus. Schleifen Sie nach Bedarf. (Abb. 1)
  • Rauen Sie die Oberfläche des Kohlefaser-Streifens 3×0,5 mm R3 mit dem Schleifpapier Nr. 120 leicht auf. Kleben Sie ihn mit einem mittelflüssigen Sekundenkleber an die Endleiste der Flosse.
  • In das Höhenleitwerk T1 kleben Sie die Strebe T3 aus Pappel-Sperrholz. Nach dem Aushärten des Klebstoffs schleifen Sie die Strebe in eine Ebene mit dem Leitwerk.
  • Schleifen Sie die Oberfläche aller Leitwerksteile mit dem Schleifpapier Nr. 120 und runden Sie ihre Kanten ab. Die Nasenleiste des Seiten- und Höhenruders schleifen Sie in einen Winkel nach Det. D–D.
  • Die Leitwerke werden nach dem Aufkleben des Leitwerkbettes auf den Leitwerksträger fertiggestellt (siehe Rumpfbau).