Translations:KAVAN AP09 - Instruction Manual/57/en
2. Fully close the needle valve and then open it by 2.5 turns. Fully closed is when the high-speed needle valve is screwed clockwise all the way into the assembly. Unscrewing the needle valve enriches the fuel mixture.